I built a 24 volt DC power system and will make it a standard at every site.
Well the power plant Fitzgerald Lane, Occidently was not completed. Not even close. I’ve decided to completely change my approach. I will be making everything a native 24 volt power system. No converting PG&E power to 12 volts, then to 24 volts via a triditional battery backup system. Instead it will be all 24 volts. PG&E’s job will just be charging the 24 volt battery bank. Less is more.